Home Contact Us
CASE STUDIES
  • FEMA VTC Credenza
  • Broome Arena
  • NORAD Command Center
  • NOAA Command Center
  • Apache Helicopter Simulator
  • CITGO Refinery Control Room
  • Capufe' Control Room
  • IAC Display Wall
  • AMC Operations Center
  • Boston College Presidential Suite
  • BET Entertainment Live (Disney)
  • APS Control Room
  • Las Vegas Valley Water District
  • TELCEL
  • Disney Hub Wall Retrofit
Ask Your Question
Name
Email ID
Phone
Question
 
Newsletter Signup
Name
Email ID
 
Contact Information
2926 W. Pendleton Ave
Santa Ana, CA 92704
Toll Free: (800) 650-8845
Direct: (714) 540-5220
Fax: (714) 540-5221
 
 
FEMA VTC Credenza
Description

For the FEMA VTC Credenza Project CDS worked with its Authorized Integrator in Tampa, FL AVI, to design a freestanding credenza, that would accept pre-wired racks of A/V equipment, have adjustastbel shelving and support (2), 65" LCD monitors alonge with a centrally-mounted VTC Camera.  No Problem!  The CDS CAD Department worked with AVI to take their "napkin engineered" drawing to make it production-ready.  We then provided some laminate samples for the customer to choose-from and then went to town!

The credenza shipped in four, easy-to-assemble pieces, complete with the monitor mounts and hardware.  No GC scheduling conflicts to deal with just shop-tested,  plug-and-play, custom VTC success!

Download PDF's
FEMA
 
Testimonials
Dennis Thomas
Video Project Manager El Dorado Park Church
Hi John,   I just want to drop you

Brad Orme
V.P. of Sales, Five by Five Communications, Inc.
John runs the best company in the industry for custom-made,